MVR Evaporation Complete Plants (We provide packaged techincal services, welcome consulting)
$0.00
Brief Introduction:
In MVR, the secondary steam evaporated from the evaporator is adiabatically compressed by a mechanically driven compressor, increasing its pressure and temperature, fully utilizing the latent heat of the secondary steam.
Advantages:
more energy and operating costs saving, small footprint, less public works, less total investment in the project, reliable operation and high degree of automation, and except for the initial startup, no need to add fresh steam during production.
Application:
-Evaporation and crystallization of materials with a wide range of evaporation capacity, heat sensitivity or high viscosity.
-Evaporation and crystallization of low-concentration wastewater that is prone to scaling.
-Especially suitable for where electricity prices are relatively cheap, steam is high price or unstable supply.
Equipments Related:
Capacity: 50000tons - 1.5million tons/year
Process: Continuous
Evaporating Stage: 1
Material: Titanium, DSS, SS316L or SS304
Controlling Panel: DCS
Shipments Time: 3-6 Months
Installation and commissioning: 1-2 Months
Warranty: 1 Year
Service: 24/7
In MVR, the secondary steam evaporated from the evaporator is adiabatically compressed by a mechanically driven compressor, increasing its pressure and temperature, fully utilizing the latent heat of the secondary steam.
Advantages:
more energy and operating costs saving, small footprint, less public works, less total investment in the project, reliable operation and high degree of automation, and except for the initial startup, no need to add fresh steam during production.
Application:
-Evaporation and crystallization of materials with a wide range of evaporation capacity, heat sensitivity or high viscosity.
-Evaporation and crystallization of low-concentration wastewater that is prone to scaling.
-Especially suitable for where electricity prices are relatively cheap, steam is high price or unstable supply.
Equipments Related:
Capacity: 50000tons - 1.5million tons/year
Process: Continuous
Evaporating Stage: 1
Material: Titanium, DSS, SS316L or SS304
Controlling Panel: DCS
Shipments Time: 3-6 Months
Installation and commissioning: 1-2 Months
Warranty: 1 Year
Service: 24/7